Distribution and supply of natural gas

Industrial park is connected to a natural gas distribution network through high-pressure gas feeder RS 15000/2/1-Qmax= 15 000 Nm3/h.

Connected to the high-pressure grid via RS 15000/2/1 – Qmax = 15 000 Nm3/h, providing 150 MW of total energy capacity.

With only 15% current utilization, this massive reserve guarantees secure direct gas supply for industrial tenants while providing ample capacity for on-site power generation to feed the DDC.

Supply of the site by process water is from the river Danube after the mechanical treatment of water. Drainage of sewage, technological and rainwater is done through a single sewer for treatment: DN2400 / 1500.